Corby Eurohub: Project Profile

TransDevelopment paved nearly 40 acres of yard areas for vehicle storage, constructed four site buildings, and developed extensive track work and ancillary facilities. Once the design work was finalized, the Eurohub took nine months to complete. The Corby Eurohub has several design features commonly found at North American terminals, including a truck-away loading roadway and site security systems. TransDevelopment collaborated on the Corby project with several UK-based engineering and construction partners.

read more
Louisville Intermodal Terminal Substantially Complete

Louisville Intermodal Terminal Substantially Complete

Just five months after breaking ground on the Louisville Intermodal Terminal, TransDevelopment achieved substantial completion of the new 25-acre facility. The terminal was built under a demanding timeline that required operations to start on New Year’s Day to meet CSX Intermodal’s customer commitments. The facility was developed on an existing industrial parcel, which had one a mile of mainline frontage. The terminal has two loading tracks, which are served by modern reach-stackers capable of unloading containers off of both tracks. To accommodate the lift equipment and container stacks, a 21-inch thick section of roller-compacted concrete was installed throughout the operating area. Existing on-site buildings were rehabilitated to serve as the administration and maintenance buildings, and state-of-the-art site lighting and IT equipment was installed. TransDevelopment served as the turnkey Development Manager for the project, with responsibility for the planning, design, site-civil work, paving, buildings, electrical, and track improvements for the $12 million facility.

read more
TransDevelopment Completes Fairburn Intermodal Craneway Project

TransDevelopment Completes Fairburn Intermodal Craneway Project

TransDevelopment recently completed a new, $2.2 million turnkey expansion to the largest Atlanta-area terminal served by CSX Intermodal. The expansion was designed to enable Rubber-Tire Gantry (RTG) crane service to the final two loading tracks. Six RTG-capable tracks are now in service at Fairburn. The project established a 4,800-foot long craneway, constructed with roller-compacted concrete in two zones. The project also included earthwork and drainage improvements to accommodate the craneway, as well as relocation of six high-mast light towers. The crane service is expected to improve the efficiency of the loading tracks, which were previously served with side-loaders. Following the groundbreaking in July, the project was completed over the course of four months. Terminal operations were unaffected throughout the duration of the work.

read more
TransDevelopment Breaks Ground on Massachusetts Bulk Handling Facility

TransDevelopment Breaks Ground on Massachusetts Bulk Handling Facility

TransDevelopment Group broke ground last month on an $11 million bulk unloading terminal in Westborough, Massachusetts. The 25-acre terminal will feature six unloading tracks with a capacity of 140 railcars. The facility is master-planned to accommodate an additional 60 railcars on three tracks. The facility is planned to be TRANSFLO’s main terminal serving the Boston area. A location on land previously used as a railroad facility was chosen to reduce project costs and environmental impacts.
The project is planned to be operational by November 2012.

read more

Port of Richmond Breaks Ground on $40-Million Rail Project

The Port of Richmond has broken ground to kick off a $40-million rail infrastructure development that will allow the port to handle more than 145,000 imported American Honda vehicles per year. Earlier this year, American Honda announced that it would shift some of its imported vehicle volume to Richmond from the Port of San Diego. The construction project will dramatically increase BNSF Railroad service to the port. The existing rail line serving industrial tenants along the port entrance roadway will be upgraded and a second, dedicated, rail line will be added exclusively to serve the Honda account and other automotive tenants. A seven-track railcar loading and unloading facility will be built at the Point Potrero Marine Terminal.

read more

Port of Richmond Opens Upgraded Auto Terminal

The Port of Richmond and Auto Warehousing Co. have formally opened the new 100-acre automotive distribution facility at the historic Point Potrero Marine Terminal. American Honda has begun distributing vehicles through the facility. Members of the Richmond City Council, the Port of Richmond, Auto Warehousing and the BNSF Railway held a grand opening Sept. 14th to commemorate the new terminal and Honda’s return to Richmond. TransDevelopment Group designed and built the $40-million project under contract with terminal operator Auto Warehousing. TransDevelopment also managed project planning, environmental permitting and development coordination with the BNSF and neighboring industrial companies.